Week 2 already splits your attention between Amai’s food events, bake-sale pressure, and Info-Chan checklists. Digging through nested phone tabs mid-corridor is how you miss a bell. The November 1, 2026 update makes Schemes reachable from the Schedule menu in Week 2, and it fixes the bug where that path failed to load Schemes properly.
Content note: Systems/UI guide. Mature game; keep strategy language.

For economy and scheme types, stay with Info-Chan schemes, Info Points, and phone tools. This page is the navigation shortcut.
What changed
From the November 1st Update:
- Feature: Schemes menu can be opened from the Schedule menu during Week 2.
- Fix: Attempting that path no longer fails to load Schemes correctly.
If your Week 2 Schedule→Schemes tap softlocks or returns empty, you are probably on a pre-fix folder—update via Download.
How to use it in a real day
- Open Schedule when you already planned to check Amai/Senpai blocks.
- Jump to Schemes from that surface instead of backing out to the root phone grid.
- Confirm today’s expulsion/reputation/matchmaking row against the clock (remember the 3:30 PM Expel purchase cutoff).
- Close menus before you sprint—students still read panic movement.
Habit loop: Schedule check → Schemes check → move. One decision cluster per stop.
Why Week 2 needed this
October’s Schemes refactor made guidance available during Amai’s week, not only Osana’s. More rows means more mid-day re-reads. Wiring Schemes into Schedule cuts tab thrash when you are comparing “her lunch event” against “scheme step 3.”
Deep Amai-scheme reading belongs in the Amai week Schemes guide and the Amai week strategy overview.
Troubleshooting
| Symptom | Action |
|---|---|
| Schedule opens, Schemes missing | Confirm you are actually in Week 2; update past November 1 |
| Schemes entry hangs / blank | Clean update; remove phone UI mods; retest |
| Schemes open but Expel gray | Check time ≥ 3:30 PM—shop rule, not Schedule bug |
| 1980s Mode | Info-Chan phone economy differs; do not expect 202X Schedule wiring |
Pair with freestyle expulsion
November 1 also lets Osana expulsion succeed without slavish scheme order. Use Schedule→Schemes to orient, then adapt pathing when living cameras or timing block a listed step. Checklists are maps, not railroad tracks.
Open Schedule, peek Schemes, close the phone, walk. Week 2 rewards players who treat the UI like a pit stop, not a campsite.